fbpx

Parmiter’s School

Parmiter’s School Case Study

Thrulane takes pride in being a preferred company for school installations in and around London, with a portfolio that includes over 200 installations, including Parmiter’s. When approached by Parmiter’s to enhance their current security and improve the appearance of the school and adjoining sports centre, we developed a comprehensive package. The project included four sets of electric vehicle gates, two pedestrian access gates, perimeter fencing, access control, power supply, and all necessary groundworks. Completed within a 4-week period during the summer break, the project cost approximately £50k.

parmitters after 1
parmitters before 1
parmitters after 2
parmitters after 3
parmitters after 4
parmitters after 5
parmitters before 2
previous arrow
next arrow
parmitters after 1
parmitters before 1
parmitters after 2
parmitters after 3
parmitters after 4
parmitters after 5
parmitters before 2
previous arrow
next arrow
get in touch